Identifier: 15271

Harkortstraße 25

40880 Ratingen
Available Office Space
approx. 71 sqm - 501 sqm
Monthly Office Space Rent (Excl. VAT and Additional Costs)
€6.00 - €7.00/sqm
Monthly Additional Costs (Excl. VAT)
€2.50/sqm
Move-In Date
Short-Term
Commission
Free of Commission
Monthly Parking Space Rent (Excl. VAT)
€25.00/space
Total Space
approx. 2,736 sqm
Year of Construction
1982

Amenities

Fixed Amenities

  • Exterior, Electric Sun Protection
  • Openable Windows
  • Elevator
  • Dado Cable Ducts

Variable Amenities

  • Carpet
  • Downlights
  • Cat 7 Wiring
  • Adjustable Floorplan
  • Kitchen
3 minutes by Car
A52 / A44
10 minutes by Car
Bahnhof Ratingen Ost
10 minutes by Car
Düsseldorf Airport (DUS)
5 minutes on Feet
756 / 757 / 758

Area Layout

Rental Space

{{firstValue(area, 'floor')}} {{firstValue(area, 'buildingPart')}}Office Space {{ areaFromTo(firstValue(area, 'officeSpace')) }} {{getFreeFrom( area) }}

Additional Areas

Floor Building Part Type of Space Available Space Divisible from. Rent from Rent up to Move-In Date

Additional Information

  • Lagerflächen stehen zur Anmietung zur Verfügung.

In each case, the monthly rental price is plus extra bills and the statutory VAT and shall depend on the desired furnishing, contract term and the tenant’s creditworthiness.
All information provided is based on information provided by the landlord / owner / project developer. ANTEON shall not assume any liability for the accuracy of this information. Errors and interim leases are reserved.

Energy Performance Certificate: The amended German Energy Saving Ordinance (EnEV 2014) has been in force since May 1, 2014. According to §§ 16,16 a EnEV, the owner, seller, landlord, l and lessor is obliged when marketing real estate to hand out or display the energy certificate of the property in accordance with the legal requirement during inspections and to include certain energy parameters from the energy certificate in the real estate advertisements and exposés. We have already requested the owners to provide us with their certificates and we are in the process of implementation.